Stainless steel worktops, sinks, splashbacks and shelving, from GEC Anderson, have been installed at The Lab at Fitzjohns Primary School in Hampstead. They provide a durable, professional looking kitchen area as well as adding valuable light to an otherwise dark space.
The work carried out in the Lab, a science and cookery facility, is part of a phased transformation of the school, involving a complex programme, designed to cause minimum disruption to the occupied school.
The school is split into four blocks; the main block being listed and over 150 years old. The Lab is located on the ground floor of this block in an old culvert space which had been open to the elements and was used as a dumping area!
Frank Swan, Bursar for Fitzjohn Primary said, “The Lab was built to put an additional focus on science in the school and to have a dedicated learning space for the subject.”