Skip to content
FacebookXPinterestInstagramLinkedInHouzzHouzz
+44 (0)1442 826999|webinfo@gecanderson.co.uk
GEC Anderson Logo

  • About
    • GEC Anderson
    • Stainless Steel
    • Production
    • Clients
    • Testimonials
  • Products
    • Made to Measure
      • Configurations
      • Edges
      • Bowls
        • Series A
        • Circular
        • Standard
        • Combinations
        • Wet Zones
        • Wastes
      • Splashbacks
      • Cabinets & Doors
      • Frames & Supports
      • Shelving
    • Individual Bowls
      • Circular
      • Combinations
      • Series A
      • Standard
    • Decimetric
      • Classic
      • Drainers
      • Frames & Storage
    • Sanitaryware
      • WC Pans
        • V130
        • V131
      • Urinals
      • Basins
      • Wash Throughs
      • Bucket Sinks
      • Sand Traps
      • Stortidy System
      • Mirrors
    • Buy Online
      • Made to Measure
      • Individual Bowls
      • Sanitaryware
  • Case Studies
  • Services
    • Installation
    • Documents & Drawings
    • Spec Writing
    • Technical Advice
  • Contact Us
    • Document Library
    • Download Product Literature
    • FAQ’s
    • How to Order
    • Enquiry Form
  • My Account
Home » Non-residential » Page 5
  • Special sized sinks for breathing apparatus (BA) room

    INDUSTRIAL STRENGTH STAINLESS STEEL SINKS FOR STATE-OF-THE-ART FIRE STATION

  • Kitchen worktops provide clean and professional welfare area Kitchen worktops provide clean and professional welfare area
  • Hampshire Fire and Rescue Service Badge Hampshire Fire and Rescue Service Badge
  • Brushed satin stainless steel with 30mm edge profiles (edge 7) Brushed satin stainless steel with 30mm edge profiles (edge 7)

INDUSTRIAL STRENGTH STAINLESS STEEL SINKS FOR STATE-OF-THE-ART FIRE STATION

Made-to-measure brushed satin stainless steel sinks and worktops, from GEC [...]

2023-01-23T09:36:36+00:00June 2, 2013|Emergency Services, Hampshire County Council, Kitchenettes, Leadbitter Construction, Non-residential, specialist rooms, tea points, Winchester Fire Station|
Read More
  • Decimetric sink and drainers in university laboratory

    NEW TEACHING LAB SINKS MAKE THE GRADE

  • Integrated back upstand and lipped front / side edges Liverpool Lab Integrated back upstand and lipped front / side edges Liverpool Lab
  • Integrated stainless steel sinks and drainers Integrated stainless steel sinks and drainers
  • Integrated sinks and drainers a person washing their hands Integrated sinks and drainers a person washing their hands

NEW TEACHING LAB SINKS MAKE THE GRADE

A large number of Decimetric modular stainless steel sinks, from [...]

2023-01-23T09:35:18+00:00June 2, 2013|ADP Architecture, Central Teaching Lab, Education, Laboratories / Clean rooms, Liverpool University, Non-residential, S+B UK Ltd|
Read More
  • Stainless steel worktops with drop-section and integral upstands

    STAINLESS STEEL SHINES AT THE BEANEY CENTRE

  • Stainless Steel Sink 40mm edges (edge 7) and 100mm back / side upstands (edge 10) Stainless Steel Sink 40mm edges (edge 7) and 100mm back / side upstands (edge 10)
  • 40mm edges (edge 7) and 100mm back / side upstands (edge 10) 40mm edges (edge 7) and 100mm back / side upstands (edge 10)
  • Stainless Steel Sink Lowered section Stainless Steel Sink Lowered section

STAINLESS STEEL SHINES AT THE BEANEY CENTRE

Multi-level stainless steel sinks and worktops, from GEC Anderson, have [...]

2023-01-23T09:35:40+00:00June 2, 2013|Culture & Arts, John Miller & Partners LLP, Non-residential, The Canterbury Beaney Centre, Wates Property Services Limited|
Read More
  • Watts Gallery

    STAINLESS STEEL SINKTOPS PROVIDE DESIGN FLEXIBILITY AT ART GALLERY LEARNING STUDIO

  • Guildford Guildford

STAINLESS STEEL SINKTOPS PROVIDE DESIGN FLEXIBILITY AT ART GALLERY LEARNING STUDIO

Design freedom and product flexibility was high on the architects [...]

2023-01-23T09:36:07+00:00June 2, 2013|Blenheim House Construction Limited, Class / art rooms, Compton, Culture & Arts, Down Lane, Guidford, Non-residential, Watts Gallery, Zombory-Moldovan Moore Architects|
Read More
  • Stainless steel worktops

    STAINLESS STEEL PROVES A POPULAR CHOICE FOR FITZJOHN’S PRIMARY SCHOOL

  • sinks and cabinet fronts sinks and cabinet fronts
  • Lipped front edge profile and stainless steel splashbacks Lipped front edge profile and stainless steel splashbacks
  • 14 linear metres of stainless steel worktops to external walls 14 linear metres of stainless steel worktops to external walls

STAINLESS STEEL PROVES A POPULAR CHOICE FOR FITZJOHN’S PRIMARY SCHOOL

Stainless steel worktops, sinks, splashbacks and shelving, from GEC Anderson, [...]

2023-01-23T09:36:53+00:00May 31, 2013|Class / art rooms, Curl la Tourelle Head Architecture, Fitzjohn’s Primary School - New Practical Space, Non-residential, Schools, Woodbar Limited|
Read More
  • Stainless steel first aid room worktop with stainless steel base cabinets and plinth

    ST MICHAEL’S RC HIGH SCHOOL, GARSTON

  • St Michael’s High School St Michael’s High School

ST MICHAEL’S RC HIGH SCHOOL, GARSTON

GEC Anderson's Decimetric range of stainless steel worktops, sinks, [...]

2023-01-23T09:41:09+00:00May 31, 2013|Consulting / surgeries, Curl la Tourelle Head Architecture, Education, Garston - First Aid and PE Rooms, Jarvis Contracting Limited, Non-residential, St Michael’s High School|
Read More
  • Peninsular dual trough unit with semi-circular end

    GEC ANDERSON BRUSH UP WELL FOR WREN ACADEMY

  • drinking fountain and side upstand drinking fountain and side upstand
  • Dual trough unit with integral drinking fountain Dual trough unit with integral drinking fountain
  • 130mm curved edge profile 130mm curved edge profile

GEC ANDERSON BRUSH UP WELL FOR WREN ACADEMY

The Wren Academy sponsored by the Diocese of London and [...]

2023-01-23T09:40:40+00:00May 31, 2013|Education, Elmstead Mechanical Services Limited, Lavatories, Non-residential, Penoyre & Prasad LLP, Wren Academy|
Read More
  • L-shaped worktop with integral back upstand

    SURREY POLICE HEADQUARTERS

  • lipped front edge lipped front edge

SURREY POLICE HEADQUARTERS

A range of specialist fittings were supplied by GEC [...]

2025-08-28T15:01:33+00:00July 26, 2012|Atkins, Emergency Services, Kier Construction, Laboratories / Clean rooms, Non-residential, Surrey Police HQ|
Read More
  • Fully shrouded wash basin V216

    OFFICE WASHROOM

  • Fully shrouded wash basin V216 Fully shrouded wash basin V216

OFFICE WASHROOM

The fully shrouded stainless steel wash basin V216 not only [...]

2025-06-10T03:44:56+00:00July 26, 2012|Non-residential, Washroom|
Read More
  • Decimetric sink and drainer with legs and frame and V55 Gypsum Separator

    BERNARD LEACH POTTERY STUDIO, ST IVES

  • V55 Gypsum Separator V55 Gypsum Separator

BERNARD LEACH POTTERY STUDIO, ST IVES

Freestanding sink units for the ceramics studio comprising Decimetric [...]

2025-08-21T10:09:52+00:00July 26, 2012|Class / art rooms, Education, GHK International, J & E Regan (Builders & Contractors) Limited, Leach Gallery, Non-residential, St Ives|
Read More
Previous45678Next

QUICK LINKS

  • About
  • Products
  • Cookie & Privacy Policy
  • Contact Us

HELP

  • Product Enquiries
  • Documents & Drawings
  • How to Order
  • FAQ’s
  • Terms & Conditions

CONTACT INFORMATION

GEC Anderson Limited
Oakengrove
Shire Lane
Hastoe
Tring
Hertfordshire HP23 6LY


Tel: +44 (0)1442 826999
Email: webinfo@gecanderson.co.uk
Copyright 2012 - 2022 | Made with by Envious Digital | All Rights Reserved
FacebookXPinterestInstagramLinkedInHouzzHouzz
Page load link